In April Sarens installed two new railway bridges, weighing 550 and 275t.
Sarens loaded the new bridges on SPMT's near the existing bridges, then drove underneath them to the far side. The new bridge parts were jacked up by 2m using the PJ250 system and then manoeuvred into place.